Battams Road Linear Park Bank Remediation

Battams Road Linear Park Bank Remediation

Media gallery

Category: Parks, playgrounds and reserves

Project management

Managed by: City of Norwood Payneham & St Peters

The Battams Road Linear Park Bank Remediation involves on-site recovery of the eroded riverbank along the River Torrens near the corner Battams Road & Ninth Avenue, Royston Park.

Background 

As the river flows through the metropolitan area, it is fed by stormwater runoff from the surrounding suburbs, as well as contaminants from urban areas, affecting the stability of river banks and obstructing flow.

Project detail

Work being undertaken includes:

  • debris and unstable soil removal
  • some vegetation removal to ensure bank stability and safety of our workers and the community
  • installation of concrete pins and rock reventment wall (a landscaped rock wall that steps back into the eroded embankment area) that will appeal to the natural surroundings and support the riverbank through any future high water events
  • temporary removal of existing infrastructure such as walkways and fencing for better access during construction.

The shared use path will remain open during remediation works. 

Please note: Recent un-seasonal storm events which caused higher river flows, have resulted in further bank erosion. As a result, construction works have been postponed to January 2023, to allow for a re-survey of the site and a design review.

Site Address

Corner Battams Road & Ninth Avenue, Royston Park

Cost

$600,000

Key dates

Construction works

Project Contact

Contact Paul Mercorella

Contact role Manager, City Assets

Phone 08 83664517

Email pmercorella@npsp.sa.gov.au

Subscribe to receive updates on our Major projects

Subscribe

Timeline

  • January 2023

    Works begin

    Scheduled

  • June 2023

    Works complete

    Scheduled