Overview

Cost: $500,000

Location: Sixth Avenue & Stephen Terrace Intersection, St Peters

The Stephen Terrace Flood Mitigation Upgrade forms part of a $38.4 million program to upgrade the City’s stormwater drainage network over the next 15 years.

The program will benefit the community by:

  • addressing and reducing the impacts of flooding
  • helping to protect residents, their homes and property
  • protecting the City’s assets such as footpaths, kerbing and street trees.

Background

The City’s stormwater drainage network is one of many infrastructure assets which is provided and maintained by the Council for the community. The network removes surface water from roadways and provides appropriate levels of flood protection throughout the City.

The Sixth Avenue and Stephen Terrace Intersection was identified as a priority area in the Council’s City-wide Floodplain Mapping and Long Term Drainage Program.

Project detail

The Stephen Terrace Flood Mitigation Upgrade includes:

  • construction of a underground storage pit and pipe
  • construction of a capture system to collect road surface water
  • proposed water re-use system for Burchell Reserve which will include on-site stormwater detention, cleaning and reuse.

Stephen Terrace Flood Mitigation Upgrade Timeline

  • May 2020

    Completed

    Design consultants appointed

  • July 2020

    Completed

    Concept design

  • October 2020

    Completed

    Concept Plan endorsed by Council

  • March 2021

    Completed

    Detailed design

  • September 2021

    Completed

    Construction tender

  • October 2021

    Completed

    Contractor appointed and construction works commence

  • June 2022

    Scheduled

    Construction works complete

Project management

City of Norwood Payneham & St Peters

Design

Hydrology Engineering – Dryside Engineering

Contractor

Metro and Country Civil

Contact